Featured Projects

The Orleans Health Hub

The Orléans Health Hub, a 96,000 square foot facility, offers a space in which many health and community service providers have come together, providing a one-stop shop for health.

The Fairbank – 2280 Eglinton Avenue West

This 7 story mixed-use development features 141 rental units, as well as retail amenities at ground level.

Churchill Meadows Community Centre

The City of Mississauga is providing a new park and community centre called the Churchill Meadows Community Centre.

SHSC Brain Sciences

SHSC Brain Sciences, located on the ground floor of the Sunnybrook Health Science Centre, will be the location for the new 38-bed inpatient mental health unit.

St. Michael’s Hospital – BARLO MS Ward

St. Michael’s Hospital – BARLO MS Ward project is an interior fit-up of a medical clinic located on the 16th & 17th floor of St. Michael’s Hospital in Toronto.

Upper Beach Club Condo

Upper Beach Club Condo Building, located in the prestigious east-end of Toronto, boasts expansive views of Toronto’s exclusive Hunt Club and is just steps from the crystal-clear waters of Lake Ontario.

UTSC Student Residence

UTSC Student Residence is a nine storey 747-bed student residence would be developed and operated by UTSC.

LiUNA Local 183 Headquarters

The LiUNA Local 183 office in Vaughan, Ontario will serve as the headquarters of the Labourers’ International Union of North America (LIUNA) Local 183. 

York University – School of Continuing Studies

York University will add a new School of Continuing Studies building to its Keele campus to accommodate significant growth.

McMaster Innovation Park

This project will transform an existing warehouse into an innovation hub for companies and researchers who develop new health and life science technologies.

Guelph Central Library – Baker District

Guelph’s Central Library is a key component of the Baker Street redevelopment project. The building design focuses on natural light and includes various amenities for the community.

Lakeridge Heights

A mixed-use development of a 5-story retirement home containing 158 units and a senior’s apartment building containing 67 units.

U of T – Spadina Sussex Residence

University of Toronto’s most sustainable residence will house 508 students and include amenities, retail space and townhomes for faculty.

Cataraqui Heights

6-story above grade, 180-unit, 91-space elderly care / assisted living facility, consisting of two, three-storey care wings as well as one, six-storey independent living wing in the centre.

10-24 Grove Street

928 unit residential development including 3 tall buildings ranging between 21–25 storeys with a shared 5 storey parking podium, as well as an 8 storey mid-rise building.

Crosstown Community – Block 5A

This seven story mixed-use development features 141 rental units, as well as retail amenities at ground level.

University of Waterloo – Student Residence

The University of Waterloo will build a new, 500-bed residence building on its main campus with a targeted opening of fall 2026.

University of Toronto Mississauga – Student Residence

The new building, adjacent to Oscar Peterson Hall (OPH), adds 400 beds, totalling approximately 1,900 students housed on campus.

485 Albert Street

6-storey mixed-use condo and retail building on the southeast corner of Princess Street and Albert Street in the Williamsville neighbourhood of Kingston..

200 Russell Hill Road

5-storey 21 unit luxury condominium building on the north side of Russell Hill Road, west of Clarendon Avenue, in Casa Loma.

Oakville Estates Retirement Residence

New construction of a 6-story above grade, 1-story below grade, 182-bed elderly care / assisted living facility.

Pioneer Manor Bed Redevelopment

The Pioneer Manor bed redevelopment project consists of the construction of a five-storey 160-bed wing at the city’s long-term care facility on Notre Dame Avenue.

Thunder Bay Correctional Facility (PDC)

A 345-bed correctional facility that combines the operations of the current Thunder Bay Jail and the Thunder Bay Correctional Centre.

Police Division 41

The new Toronto Police Services Division 41 building in Scarborough, is a two-storey structure features ballistic glass cladding, a sloped roof with 260 solar panels, and various energy-efficient systems.

Upper Beach Club Condo

The condo building is seven storeys, with 42 suites, and seven different floor plans to choose from.

200 Russell Hill Road

5-storey 21 unit luxury condominium building on the north side of Russell Hill Road, west of Clarendon Avenue, in Casa Loma.

UTSC Student Residence

UTSC Student Residence is a nine storey 747-bed student residence to be developed and operated by UTSC.

U of T – Spadina Sussex Residence

Residence building that will house 508 students, provide student amenity space, townhouses for faculty and retail space along Spadina Avenue.

The Fairbank – 2280 Eglinton Avenue West

This 7 story mixed-use development features 141 rental units, as well as retail amenities at ground level.

10-24 Grove Street

928 unit residential development including 3 tall buildings ranging between 21–25 storeys with a shared 5 storey parking podium, as well as an 8 storey mid-rise building.

Crosstown Community – Block 5A

This seven story mixed-use development features 141 rental units, as well as retail amenities at ground level.

University of Waterloo – Student Residence

The University of Waterloo will build a new, 500-bed residence building on its main campus with a targeted opening of fall 2026.

University of Toronto Mississauga – Student Residence

The new building, adjacent to Oscar Peterson Hall (OPH), adds 400 beds, totalling approximately 1,900 students housed on campus.

485 Albert Street

6-storey mixed-use condo and retail building on the southeast corner of Princess Street and Albert Street in the Williamsville neighbourhood of Kingston..

The Orleans Health Hub

The Orléans Health Hub, a 96,000 square foot facility, offers a space in which many health and community service providers have come together, providing a one-stop shop for health.

SHSC Brain Sciences

SHSC Brain Sciences, located on the ground floor of the Sunnybrook Health Science Centre, will be the location for the new 38-bed inpatient mental health unit.

St. Michael’s Hospital – BARLO MS Ward

St. Michael’s Hospital – BARLO MS Ward project is an interior fit-up of a medical clinic located on the 16th & 17th floor of St. Michael’s Hospital in Toronto.

York University – School of Continuing Studies

York University will add a new School of Continuing Studies building to its Keele campus to accommodate significant growth.

McMaster Innovation Park

This project will transform an existing warehouse into an innovation hub for companies and researchers who develop new health and life science technologies.

LiUNA Local 183 Headquarters

The LiUNA Local 183 office in Vaughan, Ontario will serve as the headquarters of the Labourers’ International Union of North America (LIUNA) Local 183. 

Pioneer Manor Bed Redevelopment

The Pioneer Manor bed redevelopment project consists of the construction of a five-storey 160-bed wing at the city’s long-term care facility on Notre Dame Avenue.

Oakville Estates Retirement Residence

New construction of a 6-story above grade, 1-story below grade, 182-bed elderly care / assisted living facility.

Lakeridge Heights

A mixed-use development of a 5-story retirement home containing 158 units and a senior’s apartment building containing 67 units.

Cataraqui Heights

6-story above grade, 180-unit, 91-space elderly care / assisted living facility, consisting of two, three-storey care wings as well as one, six-storey independent living wing in the centre.

Police Division 41

The new Toronto Police Services Division 41 building in Scarborough, is a two-storey structure features ballistic glass cladding, a sloped roof with 260 solar panels, and various energy-efficient systems.

Thunder Bay Correctional Facility (PDC)

A 345-bed correctional facility that combines the operations of the current Thunder Bay Jail and the Thunder Bay Correctional Centre.

Police Division 41

Churchill Meadows Community Centre

The City of Mississauga provided a new community centre, which will house a gymnasium, community social/meeting space and a 25-metre pool and warm water tank.

Guelph Central Library

 This library building will house collections and archives, as well as community meeting spaces and amenities. The saw-tooth exterior design draws natural light into this welcoming and dynamic addition to Guelph’s Baker District.

The Orleans Health Hub

The Orléans Health Hub, a 96,000 square foot facility, offers a space in which many health and community service providers have come together, providing a one-stop shop for health. The idea for this hub came from an aspiration to establish a more community-oriented place of care centered in health and sustained wellness.

HDR Architecture Associates Inc.

EllisDon Construction

90,000 sq/ft

$59.7 Million

Ottawa

2021

200

Health Care

The Fairbank, 2280 Eglinton Avenue West

This 7 story mixed-use development features 141 rental units, as well as retail amenities at ground level.

superkul

124,000

$22.8 M

Residential

Toronto, Ontario

Churchill Meadows Community Centre

The City of Mississauga provided a new community centre, which will house a gymnasium, community social / meeting space and a 25-metre pool and warm water tank.

MJMA

73, 500

$51M

Recreation

Mississauga, Ontario

SHSC Brain Sciences

SHSC Brain Sciences, located on the ground floor of the Sunnybrook Health Science Centre, will be the location for the new 38-bed inpatient mental health unit. With direct access to private and secure exterior courtyards, this facility was designed around a recovery model of care in mind. The upper two levels will house an adolescent inpatient unit, a unit for youth bi-polar disorder, sleep clinics, neuromodulation and a Youth Fresh Start Program. The project is designed to accommodate future expansion, vertically.

HDR Architecture Inc.

124,000 sq/ft

$100- $150 Million

Toronto

2023

283

Health Care

St. Michael’s Hospital – BARLO MS Ward

St. Michael’s Hospital – BARLO MS Ward project is an interior fit-up of a medical clinic located on the 16th and 17th floor of St. Michael’s Hospital in Toronto. This medical clinic specializes and caters to those needing treatment and support for Multiple Sclerosis. The BARLO MS Ward houses some of the world’s top MS clinicians and researchers. What makes this centre so unique is that the focus is on the affect of MS throughout the life of the patient. Services are provided from neurologists, nurses, social workers, physiotherapists, occupational therapists, speech therapists and neuropsychiatrists.

Hariri Pontarini Architects

EllisDon Construction

30,000 sq/ft

$42 Million

Toronto

2020

79

Health Care

Upper Beach Club Condo

The condo building is seven storeys, with 42 suites, and seven different floor plans to choose from.

Onespace Unlimited Inc.

47,000

$8.5 M

Residential

Toronto, Ontario

UTSC Student Residence

UTSC Student Residence is a nine storey 747-bed student residence to be developed and operated by UTSC.

Arcadis Inc. & Core Architects

292,000 sq/ft

$97.6 Million

Residential

Toronto, Ontario

LiUNA Local 183 Headquarters

The LiUNA Local 183 office in Vaughan, Ontario will serve as the headquarters of the Labourers’ International Union of North America (LIUNA) Local 183.  The project is a 6 storey tower with mechanical penthouse and below-grade parking, connected to 3 storey wing Contains 3,000-seat assembly/banquet hall, medical and dental clinics, credit union, pharmacy, training and recreational facilities, office and administration space. The project also features keyless building utilizing Salto wireless card access system recommended and designed by Total Opening Consultants.

Diamond Schmitt Archtiects

Skygrid Construction Inc

295,000 sq/ft

$125 Million

2022

650

Commercial / Institutional

Image courtesy of Perkins&Will

York University – School of Continuing Studies

York University will add a new School of Continuing Studies building to its Keele campus to accommodate significant growth and support the creation of even more innovative programs for recent graduates, working professionals, international students and new Canadians in the future. This will be the stand-alone home for the School of Continuing Studies and by Consolidating Continuing Studies programs into one building will foster a new sense of community among the campus’ lifelong learners. The project has a prevalence of barrier-free hardware elements for accessibility, including power door operators on over 15% of openings. The sustainable LEED® Gold certified building includes classrooms ranging from 16 to 60 seats, mechanical rooms, cafeteria, office and meeting spaces, and
lounge areas.

Perkins + Will

Acquicon Construction

97.000 sq/ft

$50.5 Million

2022

207

Education

McMaster Innovation Park – Commercialization and Research

This project will transform an existing warehouse into an innovation hub for companies and researchers who develop new health and life science technologies. The facility is being designed to accommodate three tenants who focus on pharmaceutical research and manufacturing. Suites will consist of office space, animal holdings, clean rooms, and various lab spaces ranging from tissue culture to radiochemistry. Additional flexible space will also be built to accommodate potential future tenants with office and laboratory suites.

The project is to be delivered in multiple phases over several years to facilitate tenant research and production requirements. The new mechanical and electrical system interfaces with a central co-generation plant to optimize energy efficiency. 

WalterFedy

$30.1 Million

2021

112

Education

Guelph Central Library

This library building will house collections and archives, as well as community meeting spaces and amenities. The saw-tooth exterior design draws natural light into this welcoming and dynamic addition to Guelph’s Baker District.

Total Opening Consultants’ specification features delayed-egress doors that prevent unauthorized exit while still allowing immediate egress in an emergency. For libraries, sound control is another major consideration-the appropriate hardware, gasketing and automatic door bottoms have been included to ensure openings achieve their desired acoustic ratings.

 

Diamond Schmitt

83,000

$30M

Recreation

Guelph, Ontario

Lakeridge Heights

A mixed-use development of a 5-story retirement home containing 158 units and a senior’s apartment building containing 67 units.



Arcadis Inc.

225,000

$40 M

Senior Care

Whitby, Ontario

University of Toronto Spadina Sussex Residence

Residence building that will house 508 students, provide student amenity space, townhouses for faculty, and retail space along Spadina Avenue.

Diamond Schmitt Architects

345,000

$75 M

Residential

Toronto

Cataraqui Heights

6-story above grade, 180-unit, 91-space elderly care / assisted living facility, consisting of two, three-storey care wings as well as one, six-storey independent living wing in the centre.

Arcadis Inc.

188,000

$45M

Senior Care

Kingston, Ontario

10-24 Grove Street

928 unit residential development including 3 tall buildings ranging between 21–25 storeys with a shared 5 storey parking podium, as well as an 8 storey mid-rise building.
Total Opening Consultants provided early design drawings for the Door Hardware Specification and Schedule to Tender.

SRM Architects

$200 M

1,147,500

Residential

Barrie, Ontario

Crosstown Community - Block 5A

A 27-storey mixed-use building within the Crosstown Community, comprised of a 4 storey podium, a 9 storey mid rise component and a 27 storey building.

architectsAlliance

345,000

$66 Million

Education

Toronto, Ontario

University of Waterloo - Student Residence

The University of Waterloo will build a new, 500-bed residence building on its main campus with a targeted opening of fall 2026.

Diamond Schmitt

168,000

$50 M

Residential

Waterloo, Ontario

University of Toronto Mississauga- Student Residence

This new building, adjacent to Oscar Peterson Hall (OPH), adds 400 beds, totalling approximately 1,900 students housed on campus.

Montgomery Sisam

116,500

$50 M

Residential

Mississauga, Ontario

485 Albert Street

6-storey mixed-use condo and retail building on the southeast corner of Princess Street and Albert Street in the Williamsville neighbourhood of Kingston.

ENFORM Architects

120,000

$28 M

Residential

Kingston, Ontario

200 Russell Hill Road

5-storey 21 unit luxury condominium building on the north side of Russell Hill Road, west of Clarendon Avenue, in Casa Loma.

Rafael + Bigauskas Architects

80,000

$17 M

Residential

Toronto, Ontario

Oakville Estates Retirement Residence

New construction of a 6-story above grade, 1-story below grade, 182-bed elderly care / assisted living facility.

Arcadis Inc.

230,000

$51.5 M

Senior Care

Oakville, Ontario

Pioneer Manor Bed Redevelopment

The Pioneer Manor bed redevelopment project consists of the construction of a five-storey 160-bed wing at the city’s long-term care facility on Notre Dame Avenue.

Bélanger Salach Architecture (BSA)

198,000

$80 M

Senior Care

Sudbury, Ontario

Thunder Bay Correctional Facility (PDC)

Infrastructure Ontario, in collaboration with the Ministry of the Solicitor General, is delivering the new Thunder Bay Correctional Complex, which will replace the city’s outdated jail and correctional centre. It will be a 345-bed facility that combines the operations of the current Thunder Bay Jail and the Thunder Bay Correctional Centre. Total Opening Consultants has been engaged as part of the PDC team, providing specialized Performance Specification (PSOS) and compliance services for door hardware.

HDR Inc.

400,000

$1.2B

Federal

Thurnder Bay, Ontario

Police Division 41

The new Toronto Police Services Division 41 building in Scarborough, is a two-storey structure features ballistic glass cladding, a sloped roof with 260 solar panels, and various energy-efficient systems, making it the first police building in Toronto designed to meet the Zero Carbon Building Standard.

Total Opening Consultants provided independent consulting services during the Construction Phase, reviewing Doors and Hardware for specification compliance.

Wects

64,000

$89M

Federal

Toronto, Ontario

Need More Details?